Molten steel being poured from a ladle inside a dark steelworks at night

Personal profile

Material judgment, applied at industrial scale.

I work between the drawing board and the rolling mill — specifying the grade, qualifying the source, and holding the tolerance that keeps a programme on schedule.

Steel sourcing · Quality · Delivery Scroll

18

Years in the trade

60+

Programmes delivered

12

Source countries

99.4%

On-time delivery

Profile

A buyer’s eye, an engineer’s standard.

I have spent my working life in the narrow space between what a drawing demands and what a mill can actually roll. That space is where industrial programmes are won or lost, and it is where I prefer to be.

My method is unglamorous: read the specification properly, qualify the source before the purchase order, and stay with the material until it is on site. Over eighteen years that has meant negotiating tonnage in unfamiliar ports, walking cold rolling lines before sunrise, and rebuilding a schedule after a single out-of-tolerance heat.

What I offer is not a catalogue of grades. It is judgment — about material, about timing, and about which supplier will still answer the phone in the third year of a programme.

Coiled steel stacked in rows inside a warehouse, two engineers walking down the aisle

Coil intake and dimensional check — the part of the job that never appears in a brochure.

Download CV (PDF)

Expertise

Where specification meets the mill.

Four disciplines, one job — making sure the grade on the drawing is the grade that reaches the site.

Specification and grade selection

Reading service conditions, corrosion exposure and forming behaviour, then converting them into a grade, a tolerance and an acceptance criterion a mill can actually hold.

Source qualification

Auditing mills and traders on process capability, traceability and financial durability — before the purchase order exists, not after the first claim.

Commercial structure

Building price, tolerance bands and penalty terms so that risk sits with the party who can control it, and a change of grade does not become a renegotiation.

Logistics and site delivery

Sequencing coil, plate and long product into port slots, heavy haul and crane windows — keeping a site fed without building buffer stock it cannot finance.

Close-up of stacked steel plates with raking light across the rolled surface
Gloved hands measuring a steel plate with a dial caliper
Gantry crane lifting a bundle of steel coils at a port at dusk
Freight train loaded with steel coils standing at a terminal at dawn

Experience

From the mill floor to the board table.

Four roles, one continuous line of work: inspection, buying, sourcing strategy, and material governance across a group.

  1. 2019Present

    Group Materials Director

    Hanlin Industrial Group

    Set material strategy across four business units, and reduced twenty-three approved suppliers to nine qualified sources without a single supply interruption.

  2. 20152019

    Head of Steel Buying

    Northline Trading

    Built the wide-plate import programme to 40,000 tonnes a year and lifted on-time delivery from 82% to 99% over three shipping seasons.

  3. 20112015

    Senior Buyer, Long Products

    Meridian Steelworks

    Held rebar and section supply through the 2012 price shock with index-linked contracts and a second qualified mill kept warm.

  4. 20082011

    Quality Engineer

    Coastal Plate Mill

    Owned dimensional acceptance and EN 10204 certification for every plate despatched, and closed the mill’s largest customer claim in its first year.

Selected work

Three programmes, three constraints.

Each of these was decided before the first tonne rolled — by the grade chosen, the source qualified, and the sequence agreed with the site.

Robotic welding arm joining a car body-in-white inside an automotive plant

Body-in-white: 6,000 tonnes in fourteen weeks

Background
A tier-one automotive supplier lost its appointed mill to a fire eleven weeks before start of production, with high-strength sheet already released to tooling.
My role
Re-qualified an alternative mill, carried the grade transfer through the customer’s engineers, and rewrote the delivery sequence around the existing press plan.

11 days earlier than the revised plan, with zero rejected coils across 214 deliveries.

Steel frame of a high-rise under construction seen from below

Structural steel, sixty-two storeys

Background
18,000 tonnes of sections from three mills, tied to an erection sequence with no room for late material and one shared crane window.
My role
Sequenced the three mills against the erection plan and held a single acceptance standard across all of them, including bolt and coating traceability.

Zero crane days lost to late steel, across an eleven-month erection programme.

Large diameter line pipe stacked at an energy terminal

Line pipe for a gathering network

Background
940 km of gathering line specified to API 5L PSL 2, sour service, and a winter weather window that allowed no second attempt.
My role
Qualified two spiral mills, ran third-party inspection at the source, and staged joints by spread so the lay crews never waited on steel.

2,400 joints accepted at first inspection, with no rework at the coating yard.

Skills & tools

The tools of the trade.

Materials

  • Carbon and HSLA steel
  • Stainless 304 / 316L
  • Wide plate and coil
  • Long and section products
  • API 5L line pipe
  • Aluminium and copper alloys

Commercial

  • Incoterms and letters of credit
  • Index-linked pricing
  • Contract risk allocation
  • Supplier audits
  • Tender evaluation
  • Claim resolution

Technical

  • EN 10204 certification
  • Dimensional inspection
  • NDT coordination
  • Grade translation
  • Weldability review
  • Coating specification

Systems

  • SAP MM
  • Power BI
  • Excel modelling
  • AutoCAD (review)
  • Supplier portals

Languages

  • English — fluent
  • Mandarin — native
  • German — working

Credentials

Qualification, on paper.

2007

MSc, Metallurgical Engineering

University of Sheffield, United Kingdom
2016

API 5L PSL 2 Auditor

American Petroleum Institute
2014

Chartered Engineer (CEng)

Engineering Council, United Kingdom

Contact

Bring me the drawing.

Send the specification, the tolerance you cannot move, and the date you cannot miss. I will tell you honestly whether it can be bought — and what it costs to keep it that way.

hello@xxx-profile.com
LinkedIn — /in/xxx Based in Shanghai, China — working across Asia and Europe

Front-end demonstration — no message leaves this page.